The dredging works have been planned in the Port of Genoa to ensure safe vessel access to the passenger and container terminals, including the future generation of ultra-large ships.
(Last refresh date 08.06.2023)
The dredging works have been planned in the Port of Genoa to ensure safe vessel access to the passenger and container terminals, including the future generation of ultra-large ships.
(Last refresh date 08.06.2023)
Project Code | P.3106 |
---|---|
Project title | Dredging in the Sampierdarena basin and the passenger port |
Project status | Project status key TFFS = Technical and Financial Feasibility Study, DD = Detailed Design, ED = Executive Design, Activity completed Activity in progress
|
Project value | €9,201,666.57 |
Current activities | WORKS COMPLETED |
Timeline |
Start Date:
June 2022 Completion Date: May 2023 |
Contractor | |