
The cranes, hired by Fagioli Spa, are up to 130 metres high and have a lifting capacity of 1200 tons. The oversized cargo is due to be delivered immediately to the construction site where the cranes will be installed.
The unloading operations of such a difficult project cargo was made possible through the collaboration between Terminal San Giorgio Srl and Fagioli Spa, leading company specialised in the handling and transport of heavyweight cargo.