![](/images/NOTIZIE_Imm/TorrePiloti.png)
Quay reconstruction at the new Control Tower site is completed. Works on the tower are scheduled to go ahead after the closure of the 62nd edition of the Genoa Boat Show at the end of September, to minimise disruptions to the smooth running of the major international event.
Strategically located on an artificial island in the Levante marina, the Control Tower has been planned to ensure that all classes of ships can manoeuvre in full safety in/out of the Port of Genoa. Designed by Renzo Piano, the 60-metre high glass and steel tower will be flanked by two elevated build...